Site Assessment Form

In order to better help you it would be great to get some more information about your project. Please fill out our Site Assessment Form and one of our Application Engineers will contact you shortly.

  • How soon do you anticipate your project beginning?
  • Please attach all plans and line drawings.
    Drop files here or
    Max. file size: 50 MB.
    • What is the highest anticipated monthly energy usage of the system owner?
    • Grid Voltage and Frequency:

    • Anticipated Peak Load (kW):

    • What is the peak power demand in kW that is anticipated to occur during the year (e.g., in the summer when air conditioning is on its highest setting and people are frequently indoors using various appliances, or in the winter when all electric heating is utilized)?
    • In which month is the peak load anticipated to occur?
    • New or Existing Alternative Energy Production (PV, Wind, etc):

    • Please indicate how many days the system must be able to run on its own during anticipated grid outages, long periods of rain, etc.

    • Stay Current
      with SimpliPhi

      Subscribe to our newsletter
      for news, updates, free
      Elite IQ trainings and more.

    • This field is for validation purposes and should be left unchanged.